 | The GOH evaluation cards in the barracks. |
 | The GOH irradiation test setup before radiation. |
 | The proton beam machinery and the GOH to be irradiated. The beam line is directed out of the picture. |
 | From the left, R. Egeland, R. Zuyeuski, A. Singovski, A. Dolqopolov, G. Dewhirst in the experimental hall. |
 | The GOH to be irradiated. |
 | From the left, R. Egeland, A. Dolqopolov, R. Zuyeuski, G. Dewhirst, A. Singovski in the barracks room at PSI. |
 | A shot of the GOH evaluation software, the BERT and the I2C control interface. |
 | J. Grahl, A. Singovski, G. Dewhirst, and A. Dolqopolov troubleshooting software in the barracks. |
 | The GOH irradiation test setup after irradiation. Notice the darkened PCB, and the light area that shows that the GOH shielded protons. |
 | The experimental hall at PSI. |
 | From the left, J. Grahl, R. Egeland, G. Dewhirst, A. Dolqopolov in the baracks at PSI. |
 | The rear of the GOH irradiation setup, here we see the darkened irradiated PCB and the lower area which was protected by lead bricks, to save non-rad hard electronic there. |
 | A shot of the beam monitoring and control software at PSI. |
 | A. Dolqopolov working on the test board. |
 | Preparing the GOH to be irradiated. |
 | Close up of the GOH irradition test pieces. |